Stamford Park Footbridge
Altrincham
£30k
Waterman Aspen position held - Project Manager
Involved in the preparation of contract documents, site supervision, final accounts and handover after completion of the scheme.
|
SEN Schools
Edinburgh
£11M
Waterman Aspen position held - Principal Engineer
Construction of 3 new special needs primary schools. Responsible for liaison with Client, Design Team and Statutory Authorities. Responsible for staff and budgets. |
|
Water of Leith Flood Prevention Scheme
Edinburgh
£35M
Waterman Aspen position held - Project Engineer/Assistant Project Manager
|
Inverclyde, Design Services
Greenock
Capital and Revenue Budgets
Waterman Aspen position held – Senior Engineer
Investigation, design and implementation of Revenue and Capital projects. Involves production of client brief, cost estimation, site investigation, preliminary and detailed design, production of contract drawings and documentation, supervision on site and settlement of final account.
Other duties include design/assessment input into Development Control, Flood Prevention, Drainage and Reservoirs. |
Liverpool Canal Link
Liverpool
£17.5M
Waterman Aspen position held - Senior Technician
Responsible for production of prelim. Scheme proposals using AutoCAD, writing H & S plans & risk assessments, programming using MS Project, procuring and supervision of SI works.
|
Regeneration Manchester, Bolton & Bury Canal
£45M
Waterman Aspen position held – Project Engineer
Putting together reports including, Cost Estimate and B of Q, Detailed drawings, length & structural insp., environmental issues, heritage issues, canal and towpath improvements, waste management, sediment sampling & trial holes, canal dredging contracts, liaison with MB & B canal society and councils, Service Checks. |
Murton Jubilee Primary Schools
Murton
£1M
Waterman Aspen position held – Lead Design Technician
Design for pre-manufacturing structurally insulated panel system.
|
Blue House East Bridge Replacement
A1058 Coast Road, North Tyneside
£2M
Waterman Aspen position held – Design Engineer
Interim monitoring of existing structure. Detailing of a new two span composite bridge carrying the A1058 dual carriageway.
|
|
Silver Jubilee Bridge
Runcorn
£430K
Waterman Aspen position held – Planning Supervisor / RE
Design and Production of Contract Documents (ICE 5th Edition) |
A533 Southern Expressway
Runcorn
£50K
Waterman Aspen position held – Project Engineer
Floodbrook Underpass - Deck Strengthening
Assessment/AIP/Design of Strengthening works/Production of Contract Documents.
|
Sheaf Square Redevelopment
Sheffield
£35M
Waterman Aspen position held – Design Engineer.
Redeveloping space outside train station into new Public Square , Sheffield City Council
Design of structures. Design team liaison between design office and Contractor during construction.
|
Transport Scotland
South West Unit of Scotland
Waterman Aspen position held - Area Manager
Assisting in the management of the South West Unit operating company contract with responsibility for overseeing maintenance and minor improvement on the A75, A76 and A751 Trunk Roads in the South West of Scotland.
|
|
Reconstruction of Ladybridge
Stockport
£600K
Waterman Aspen position held - Project Manager
Existing concrete portal frame widening found to be weak and a replacement reinforced concrete arch with reinforced earth wing walls is being constructed over a period of 36 weeks. |
West Fife 20mph Zones
Scottish Executive
£285K
Waterman Aspen position held – Project Manager
20mph zones for seven towns, part-time 20mph limit with electronic signage for one town and new pelican/toucan crossings at four locations.
Responsible for the designs, costings, road hump notices, consultations and construction supervision.
|
|
West Lothian Council, Road Maintenance Programme
£90M
Waterman Aspen position held – Project Engineer
Preparing full documentation and working drawings using AutoCAD, complete financial monitoring with eventual hand over to Client.
|
|
Halton View Road
Widnes
£210k
Waterman Aspen position held - Assistant Engineer
Planning and resurfacing of carriageway with installation of build outs and raised tables and speed humps.
Block paving of footways to improve the visual character of the area with provision of improved street furniture.
|
| |